Project Details
Nutan Bidyut (Bangladesh) Limited will develop a 225 MW combined cycle duel fuel power plant on 22.78 acres land at Kutba union of Barhanuddin upazila under Bhola district. This project consists of one (2) Gas Turbine Generator, one (2) Heat Recovery Steam Generator and one (1) Steam Turbine Generator, a 60 meter stack, approximately 6 km pipeline to intake gas from Sundarban Gas Company Limited. The project will require approximately 397 m3/hr water which will be taken from Dehular Canal during operation phase.
Bhola, Barishal
Shapoorji-Palonji
Whether you have a project in mind and you’re looking for a reliable construction partner or you’re looking to take the next step in your career, we want to hear from you!